Failed the inspection? Fix the dangerous part first and plan the rest
Send us your findings
Give the address and list the items your inspection report flagged. We reply with a staged plan.
A typical staged plan
Here is how we usually split a failed Level 2 on an older La Mirada house. Your stages depend on what your report found, but the logic stays the same: fire and gas first, water second, wear third.
Some items move up a stage when they feed each other. A leak that keeps soaking a cracked crown, for example, gets fixed with the crown.
- Stage one, before the next fire: cracked or missing flue tiles, gaps toward framing, a damaged firebox, any gas fault
- Stage two, before the rains: leaking metal at the roof, open flue tops, a crown that lets water in
- Stage three, when budget allows: worn joints, spalled brick faces, a stiff damper, cosmetic work
Why stage one cannot wait
Stage one items are the ones that let heat or exhaust reach places they should not. A split flue tile can pass hot gas into the wood beside the chimney. A failed firebox lets heat into the wall behind it. Until those are fixed, the fireplace should stay unused, and the report will say so.
If the fireplace is not needed for a while, stage one can mean simply not lighting it until the repair is booked. We write that on the plan so the household knows.
What each stage costs and how it is billed
Every stage gets its own written price and its own booking. You approve one, we do it, and the next waits until you are ready. Nothing in a later stage is started without a fresh go ahead.
Where our price list covers an item, that figure goes straight into the plan. Liners, crowns, dampers, chase covers and flashing by itself have no set figure, because the work varies so much from one chimney to the next; we price those on paper once we have measured them.
Published prices for common fixes
These are the items with a set range on our list. The rest of a plan is priced item by item on paper.
- Finding and stopping a chimney leak
- $535 to $3,200
- Water diverter built on the roof behind the stack
- $425 to $965
- Diverter together with all new roof metal
- $640 to $1,600
- Gas unit fitted into the current opening
- $2,650 to $5,350
- Camera check after the work is done
- $375
- Metal cover over an open flue top
- Quoted after we measure
A new camera inspection after the work is optional and useful when a buyer, lender or insurer wants proof the items were fixed.
Staged repair questions
Which stage do I have to finish before I use the fireplace?
Stage one. The rest protects the house from water and wear, but stage one items are what make lighting a fire unsafe.
Can stages be done in a different order?
Stage two and three can swap if budget or weather suits. We advise against starting anything before stage one is booked.
Our report came from another company. Can you plan from it?
Yes. Send the items and we sort them into stages. Where a finding is unclear we may suggest our own look before pricing it.
Would a gas insert replace some of the repairs?
Sometimes. An insert vents through its own liner, so some flue and firebox items stop mattering. We show both routes side by side when it applies.
Do you check the work when a stage is finished?
Yes, we photograph each finished item and add it to your plan, so you have a record of what was done in which stage.
Turn the failed report into a list you can work through
Send the address and your report's findings through the contact page. We return a staged plan with prices for each stage.